High reputation Globe Stop Valve - Dry barrel fire hydrant ULFM Approval – BESTOP
High reputation Globe Stop Valve - Dry barrel fire hydrant ULFM Approval – BESTOP Detail:
1.Hydrants should be handled with care to avoid damage. It is recommended to keep hydrants closed until use.
2.If the hydrant is not to be used straight away then it is recommended to coat threads and other machined parts with anti-rust oil and the hydrant should be stored in a dry and ventilated area. For long-term storage, the hydrant should be checked regularly.
3.Before installation of hydrants, the connection should be free from dirt or other matter.

4.The positioning of the hydrant should be in accordance with local requirements.The pumper should face the street and all connections should be away from any obstruction to connecting hoses.
5.The inlet elbow should be placed on a solid surface and if possible brace the side opposite the incoming flow to reduce reaction stresses.The underground parts of the hydrant should be surrounded with coarse gravel for support and drainage
6.After the hydrant has been installed and tested,it is recommended to fully flush the hydrant before closing for service. Before replacing the nozzle caps, It is recommended to check for correct drainage of the hydrant on closing of the valve.This can be achieved by placing a hand over the nozzle opening,a suction should be felt.
1.Unscrew the nozzle caps and connect hoses.
2.Open the hydrant using the hydrant key (included) to the fully open position by turning the operation nut in an anti-clockwise direction-Do not force the hydrant to open further pest the fully open position. Note that the hydrant valve is not intended to control the flow, it should be used in either the fully open or fully closed position.
3.To control flow, a pressure/flow control valve should be fitted to the nozzie outlets on the hydrant.
4.To close, turn the operation nut into a clockwise direction again, do not over tighten.
1.Carry out a visual inspection for signs of significant corrosion which may impair performance.
2.Where possible,carry out leakage tests by opening one of the nozzle caps sightly and then open the hydrant valve.Once the air has escaped, tighten the hose cap and check for leaks.
3.Close hydrant and remove one nozzle cap so that the drainage can be checked.
4.Flush the hydrant.
5.Clean and lubricate all nozzle threads
6.Clean the exterior of the hydrant and repaint if required
Product detail pictures:
Related Product Guide:
Our target is to consolidate and improve the quality and service of existing products, meanwhile constantly develop new products to meet different customers' demands for High reputation Globe Stop Valve - Dry barrel fire hydrant ULFM Approval – BESTOP , The product will supply to all over the world, such as: Palestine, Bahrain, Mexico, When It produced, it making use of the world's major method for reliable operation, a low failure price, it appropriate for Jeddah shoppers choice. Our enterprise. s situated inside the national civilized cities, the website traffic is very hassle-free, unique geographical and financial circumstances. We pursue a people-oriented, meticulous manufacturing, brainstorm, make brilliant company philosophy. Strict good quality management, fantastic service, affordable cost in Jeddah is our stand around the premise of competitors. If needed, welcome to make contact with us by our web page or phone consultation, we will be delighted to serve you.
The company keeps to the operation concept scientific management, high quality and efficiency primacy, customer supreme, we have always maintained business cooperation. Work with you,we feel easy!